  • Client: Lord Burnham
  • Project Duration: June '16 - April '17
  • JCT 2011 Design & Build

Project Team

  • Architect: Bidwells
  • Quantity Surveyor: Baqus
  • Project Manager: Bidwells
  • Structural Engineer: Andrew Firebrace Partnership
  • Mechanical Consultant: KJ Tait Engineers

This unusual project entailed the demolition of an existing barn and the construction of a 2 storey commercial building for rent. As the site had a rural setting the building was designed to give the feel of a farmhouse with extensive landscaping, whilst still having easy transport links.

The building is the first of 3 phases on the site and has an array of modern built-in features including; traditional strip foundations, steel frame with MMC internal walls, timber cladding, natural knapped flint, masonry and timber clad walls, pitch slated roof and air-source heat pumps.

Due to the building’s location on the site, a Klagester biodegradable waste water treatment plant was installed to handle effluent water disposal.

Jarvis Contracting Industrial & Commercial

We design, build and refurbish offices, factories, hangars, warehouses and out of town retail schemes. Find out more.