Project Information

  • Client: Watford Community Housing
  • Contract Value: £1,270,000
  • Project Duration: Feb'17 - Sept'17
  • Contract Type: JCT Design & Build

Project Team

  • Architect: Avebury Projects Ltd
  • Quantity Surveyor: Pulse Associates
  • Project Manager: Pulse Associates
  • Structural Engineer: Chiltern Design

Previously occupied by disused garages, the land was sold by Three Rivers District Council to the client where demolition followed and 6 new 2 bedroom apartments were built within 3 separate blocks. Each block contains 2 apartments of which 4 are for shared ownership and 2 for council rent, with each have individually contained gardens and 2 parking spaces with communal landscaping. The shared ownership lots had floor finishes installed throughout and integrated appliances fitted.

The construction is timber frame with clay tiled pitched roofs, blending in well with the surrounding residential properties. Planning conditions stipulated that obscured glazing and non-opening windows were required at first floor level to provide privacy to the rear gardens and openable roof lights were also installed throughout the first floor to ensure adequate light and ventilation is provided.

Watford Community Housing

Jarvis Contracting Social Housing

We have built hundreds of homes for housing associations, local authorities and private companies. Our MMC System offers clients the choice of off site manufacture. Find out more.