Project Information

  • Client: The Hillingdon Hospital NHS Trust
  • Contract Value: £820,000
  • Project Duration: Jun'18 - Nov'18
  • Contract Type: JCT 2011 D&B

Project Team

  • Architect: DesM
  • Quantity Surveyor: Currie & Brown
  • Project Manager: The Hillingdon Hospital NHS Trust
  • Services Consultant: Wooster Jeffs

After relocating the facilities of the existing Urgent Care Clinic (UCC), this area was then transformed to expand the A&E Department and a superb finish was achieved within a live emergency environment.

Close liaison with the hospital staff was critical for managing the installation of mechanical plant, which had to be crane lifted onto the roof, and careful planning was required whilst one half of the A&E access ramp was closed down one Saturday morning.

This phase has provided the department with a new nurse base, a mental health room with anti-ligature features, separate clean/dirty utility rooms and 7 examination rooms – 4 curtained cubicles and 3 treatment rooms (2 with ensuites).

Finishes were all completed to the latest HMO standards, with BioClad wall coverings, Sterishield paint and hygienic ceiling panels. Special bedheads provide lighting, suction and medical gases, with hygienically sealed doors installed incorporating vision panels with internal privacy blinds. Lighting sensors were also installed throughout, that respond to external light conditions.